Current Projects

DOT Brainard Airport: Airport Rescue & Firefighting Facility

Hartford, Connecticut

New ARFF Facility approximately 7,000sf & 2 Acres Site Development. Project consists of new site utilities, removal of approximately 2,000 tons of regulated soils, new building composed of (2) maintenance vehicle bays, (2) ARFF vehicle bays and an office area. The building sits on concrete foundations and includes CMU walls, structural steel, steel joists, a membrane roof, metal wall panels, overhead doors, plumbing, HVAC, electrical, Fire Alarm and a stand by emergency generator.

Maintenance and Aircraft
Rescue & Firefighting Facility
Project No. 63-637
Project Start: September 2012
Project Completion: October 2013
Contract Amount: $2,865,533
Owner:State of CT, Department of Transportation
Owner's Rep Robert Flaminio, District 1, Project Engineer Brian Orcutt, District 1, Field Engineer
Architect: State of CT, Department of Transportation Office of Engineering



Connecticut Department of Transportation

Colchester, Connecticut

Building work consists of the construction of a single story maintenance facility that is approximately 65,000 square feet, composed of vehicle bays for electrical and specialty bays for Repair, a Stores Stockroom, Materials Testing Laboratory, Soils Storage Area, and office areas. The building is steel frame construction with exterior insulated metal wall panels and masonry.

Building work also consists of the construction of a separate single story Cold Storage Building that is approximately 5,000 square feet. The building is steel frame construction with exterior metal panels, overhead doors and concrete.

Project Notice to Proceed: September 2, 2012
Project Completion: September 16, 2014
Project Number 28-183
Contract Amount:$17,729,000
Owner:State of CT/DOT
Owners Rep: Mr. Mark Elliot, CDOT Project Engineer
Engineer of Record:AECOM



Veterans Administration Medical Center

West Hartford, Connecticut

Construction of 5,600 square foot modular buildings and complete abatement, demolition and reconstruction of 13,000 square feet of existing hospital space. The renovation creates a new 23 bed medical/surgical inpatient unit with single and double patient bedrooms and private bathrooms. Also included is the improvement and replacement of the existing Mechanical, Electrical, Plumbing, Fire Protection and Information Technology infrastructure serving the project and multiple other floors.

In-Patient Unit Renovation 6th Floor
Medical / Surgical In-Patient Units
Project No. 689-09-101
Project Completion:
November 2013
Contract Amount: $7,834,741
Owner: Department of Veterans Affairs
Owners Rep: United States Army Corps of Engineers
Architect: Moser, Pilon, Nelson